Notes: Finished the prep work for the tile and the fist few tiles are set.Construction Photos 43:
Taken 20 September 2003
Making the fist cuts!
![]() |
Getting through the cut.
![]() |
The first few tiles set in the upstairs bath.
![]() |
Detail of the stone in the upstairs bath. ![]() |
The covered area and the door to the "dog room" (aka laundry room)
![]() |
View of the greatroom with sheetrock tape.
![]() |
Vew of the stucco around the master bed and bath.
![]() |
Stucco on the west side.
![]() |
Another view of the west side.
![]() |
John standing by the fun post.
![]() |
The dog doors installed and trimmed out.
![]() |
The main part of the house with the scaffolds all over it.
![]() |