June 14: Starting the trench for the electrial.

|
June 14: Working on the trench for the south array.

|
June 14: Working on the long trench up to the house from the
north array.

|
June 16: Laying conduit and wire down the long run.

|
June 16: Another look at the long trench to the north array.

|
June 16: Details of the custom wire-pulling rig.

|
June 22: Just a detail of the finished pad with wire and the
trenches filled in.

|
June 28: Electrical box mounting plates and boxes for the
poles. Note the big U-bolts for the post.

|
July 12: Delivery of the posts.

|
July 12: South post installed.

|
July 12: Detail of the base of the post.

|
July 13: The first motor arrives by padded wheelbarrow at the
south tower.

|
July 13: Finally a good idea -- use the bobcat to lift the
180 lb motor!

|
July 13: Getting the motor in place over the tower.

|
July 13: Motors are in, now the
horizontal torque tubes go on, and are tightened in.

|
July 13: North-South
actuator installed on the south array.

|
July 13: Finishing the
installation of the actuator.

|
July 13: Detail of the
horzontal torque tube on the north array. These next few photos are
mostly for Michael at Array Technologies. :-)

|
July 13: Detail showing the
anti-roll pin installed.

|
July 13: Detail of the top
of the N-S actuator.

|
July 13: And one last
picture of both towers (look closely).

|
|